Dil Muhammad Road
Dil Muhammad Road called for a mixed-scope facelift blending flexible and rigid pavement solutions along a single stretch. Works covered dismantling of the existing road metalling, laying of an approved sub-base course to AASHO density, bituminous priming and tack coats, plant premixed bituminous carpeting, alongside PCC, RCC, and tuff tile finishing. MDA Constructions saw the works through within a demanding two-month schedule, leaving behind a road better equipped to serve daily traffic and the pedestrian activity that surrounds it.
WP Industry – a premium business theme developed specifically for industrial, technique, engineering or machinery businesses. Theme is elegant, modern and easy-to-use flexible, modular and responsive layout.
Latest News
- Hello world! August 29, 2026
- Here’s Why Our New Factory Will Change Everything July 17, 2015
© 2026 mdaconstructions.com • Designed by Dannci