info@mdaconstructions.com

+971 55 727 3921

  • Twitter
  • Instagram
  • YouTube

mdaconstructions.com

MENU
  • Home
  • Projects
  • Sectors We Serve
    • Infrastructure and Civil Works
    • Urban Development and Landscaping
    • Water and Wastewater Solutions
    • Hydraulic Structures
    • Industrial and Process
    • Buildings and MEP
  • About Us
  • Contact Us

Lahore Metro Bus System

Canal to Niazi Station (Phase-I) — Mass transit corridor rehabilitation

Client: Lahore Development Authority (LDA)

September 11, 2026

Few corridors in Lahore carry the daily load that the Metro Bus route between Canal Station and Niazi Station does. Entrusted with its Phase-I pavement rehabilitation, MDA Constructions undertook cold milling, bituminous tack coat application, premixed bituminous carpeting, thermoplastic lane marking, cat eye installation, and kerb stone painting along the full stretch. Completed within a demanding three-month schedule, the works have restored a smoother, safer, and more durable running surface for one of the city’s busiest mass transit routes.

Comments are closed.

  • Twitter
  • Instagram
  • YouTube

WP Industry – a premium business theme developed specifically for industrial, technique, engineering or machinery businesses. Theme is elegant, modern and easy-to-use flexible, modular and responsive layout.

Projects

Infrastructure and civil works Urban development and landscaping

Latest News

  • Hello world! August 29, 2026
  • Here’s Why Our New Factory Will Change Everything July 17, 2015
© 2026 mdaconstructions.com • Designed by Dannci